Sewage treatment

Sewage treatment facilities

Our Sewage treatment Center covers an area of ​​5,100 square meters. The first phase is designed and constructed by Yixing Zhonghui Environmental Protection Equipment Co., Ltd. The design and processing capacity is 500m³ / d. The total investment of the project is about CNY 2 million. Phase II was designed by Jiangsu Zhenyi Environmental Protection Science and Technology Co., Ltd. in 2012 and constructed in 2013 with an area of ​​about 3,900㎡ and designed capacity of 1500m³ / d. The total investment is about CNY 15 million. This center was put into use in October 2013 and has been working well so far. MVR equipment was introduced in 2016 and installation was started in May, with the designed processing capacity of 2.4t / h. The total cost of the project is about CNY 5 million and is currently under debugging.

Sewage treatment system includes pretreatment system, biochemical system, sludge treatment system, discharge tank and so on.

The standard wastewater after treatment is sent to over discharge tank through "one enterprise-one pipe" pipeline in the park into the Sewage treatment company of park.

 
 

Sewage treatment system

Sewage treatment emission standards (GB8978-1996)

 
 